Man with a mission gets bridge for Mumbai rly station

Sanjay Ghawate wrote letters to president, used RTI, to ease rail users' travails

geetanjali

Geetanjali Minhas | September 18, 2010



It may not be a misnomer to call the 44-year-old Kalyan resident, Sanjay Ghavate, the face of humanity. Son of an ex- railway employee, beneath his lean frame and restive demeanor there is an unrelenting determination for philanthropy. Travelling  back and forth daily in the central suburban railway trains between his home in Kalyan and his office in Elphinstone, he is no stranger to peak hour rush at Parel station where hundreds of patients are shoved around on overcrowded narrow platforms 1 and 2 and a single footover bridge as they struggle to keep their date with hospitals. 

Parel-Lower Parel Block has metamorphosed into a major commercial hub with plush malls and mushrooming highrise buildings. Many major hospitals including Tata Memorial, KEM, Wadia,  Mahatma Gandhi, Bachooali Eye and ENT hospital, MGM (ESI hospital), Animal hospital, Mumbai Vetenary College, BMC offices, a court and even a five-star hotel are also located in the area. As per Central Railway records, on a regular day Parel station witnesses movement of 26,365 commuters with a growth of over 16.58 percent in passenger traffic in the last one year. 

However the railways so far seem to have completely overlooked this fact. The station has so far not kept pace with developments taking place in its vicinity.

Platforms 1  and  2  at  Parel station cater to the rush of local trains while  platforms 3 and 4 are reserved for operating long distance trains and running railway workmen’s train for carrying its employees to its Parel and Elphinstone workshops on Central and Western sides.

Ghavate has since November 2009 been trying to get authorities’ attention to extend platforms 3 and 4 towards Dadar side for halting 12 coach semi-fast trains. His argument: halting eight semi-fast trains (four each in morning and evening) at Parel will provide major relief to thousands of patients who come from far and near. Currently, they go via Dadar station, a major transit hub. Though adjacent to Parel on Kalyan side it is extremely overcrowded. For commuters and specially patients who come from far it is highly inconvenient to board trains and alight from there.  

“Because of emergency and heavy commuter rush many patients cross tracks at Parel to reach hospitals, therefore meet with accidents or die. Patients holding saline bottles plugged into their noses wait for commuter rush to ease so that they can cross over the bridge but by the time another train comes more people get down. So the patients keep waiting till the time they don’t get pushed in the rush,” says Ghavate.

A proposal for a sky walk by MMRDA, crossing central and western railway tracks on Kalyan end with connection to platforms and joining the existing footover bridge (FOB) at BB end is said to have been scrapped.

Meanwhile, relentless in his conviction, Ghavate wrote to railway authorities in the city, president Pratibha Patil, prime minister Manmohan Singh, Congress  president Sonia Gandhi,  railway minister Mamta Banerjee, state railway minister E  Ahmed, chief minister Ashok Chavan, mayor Shraddha Jadhav, railways chairman Vivek Sahai, home minister P  Chidambaram, MP Milind Deora and MNS chief Raj Thackerey among many others.

Frustrated over writing letters, making umpteen telephone calls and trying to personally meet authorities his only hope remained at educating people about this need and taking the help of the media so that the government pays some attention. He has 250 signatures supporting his cause and filed an application under RTI lately.

Ghavate is particularly grateful to MP Milind Deora who supported his cause and on February 26, 2010 wrote to the then general manager, Central Railways,  B B Modgil, asking him to consider Ghavate’s suggestions of putting up an FOB in the middle of platforms with two staircases to reduce congestion.

In an exchange of letters with the railways, the chief commercial manager, P L Khanna of Central Railways on July 30, 2010 noted: “A proposal for construction of railway footover bridge connecting platform no  1, 2 with 3, 4 at Kalyan station has been sanctioned and the work will be undertaken after monsoon. The said FOB is proposed at Kalyan end as the column and landing of FOB cannot be provided in the centre as per schedule of dimensions due to limited width of platform.”

With reference to halting semi-fast trains at Parel station the letter said, “Parel station is situated 1.2 kms away from Dadar station where all fast trains are halting. If halt is provided to fast trains at Parel, the running time will increase which will  affect local train operations and also not liked by daily commuters. Parel station is well connected by Dadar and Mumbai CST. Hence it is not feasible to provide halt at Parel Railway Station.”

Divisional railway manager M C Chauhan confirmed, “We will build a new fob by June 30, 2011 with pathway landings on platforms 1, 2, 3 and 4. The cost of building this will be Rs 1 crore. The railways is also exploring the possibility of widening platforms 1 and 2." Affirming that MMRDA has withdrawn the skywalk construction, Chauhan attributed the pull out to funding problems in MMRDA.

Railway authorities will now construct an elevated pathway from above the new booking office at Parel leading to middle landings on both sides of platform 1 & 2 and 3 & 4. This will distribute commuter movement on platforms allaying of crowds at one place.

Comments

 

Other News

"TV not in business of news; it is in the business of polarisation”

Television news these days has a loose relationship with truth, says senior journalist, columnist and author Vir Sanghvi, adding that it is not telling the truth and polarising opinions. In a live webcast with Kailashnath Adhikari, MD, Governance Now, during the Visionary Talk series held by

How the colonial rulers combated “this insidious and growing danger” of dust and smoke

Dust and Smoke: Air Pollution and Colonial Urbanism: India, c. 1860-1940 By Awadhendra Sharan Orient BlackSwan, xxiv+320 pages, Rs 795 Air pollu

Unlocking the value of renewable energy assets through InVITs in India

India has been witnessing a sluggish demand growth for power amidst COVID-19. It has affected both thermal as well as renewable energy (RE) sector. While thermal sector (coal) plant load factor (PLF) is coming down continuously amidst no new generation building up, renewable energy held its ground through

“Proposed power amendments anti- people, favor licensees”

Maharashtra Veej Grahak Sanghatana, a state-level coordination committee of industrial associations and power consumers, has approached the state government for urgent intervention on key concerns after Maharashtra Electricity Regulatory Commission on December 9 published the draft of the MERC (Electricity

Uddhav inaugurates largest tunnel boring machine for Mumbai Coastal Road

Maharashtra chief minister Uddhav Thackeray has launched the largest tunnel boring machine (TBM) for the Mumbai Coastal Road project at Priyadarshini Park, in Malabar Hill area of South Mumbai. Called Mavala, the TBM having the largest diameter and the first of its size to be used in the cou

Beyond open defecation: Tackling solid waste management issues

Antony Waste Handling Cell (AWHC) has been offering its services in handling municipal solid waste (MSW) across India for the past 19 years. When AWHC made its initial public offer (IPO) during December 21-23, it was subscribed 15 times. Why the sudden interest in this IPO? Did the market rightly and exped

Visionary Talk with Vir Sanghvi On the future of News Journalism





Archives

Current Issue

Opinion

Facebook    Twitter    Google Plus    Linkedin    Subscribe Newsletter

Twitter